Planning Studies

Brunswick Pedestrian Safety Action Plan - Final Version 1

Heads Up Study

Pedestrian Safety Initiative forum to explore potential mitigation strategies to improve pedestrian safety and reduce crashes:
Pages from BTS_FinalPlan_20210506

Transit Study

Study exploring an opportunity to adjust Brunswick's Explorer service to better meet the needs of the growing Midcoast region:
Pages from 1. 2020 Bike Ped Plan Update Public Hearing Changes_8.8.2021_links

Bicycle and Pedestrian Study

Bicycle and Pedestrian Plan to serve as a guide for public transportation decisions that affect pedestrians and bicyclists in Brunswick: 
Pages from Riverwalk Draft Report 5-1-2021

Riverwalk Study

Study exploring the feasibility to widen and connect the river walk from the Frank J Wood Bridge to the Swinging Bridge: 
Pleasant Street Final Report

Pleasant Street Study

Study to analyze potential improvement strategies to improve congestion and safety along the Pleasant Street corridor for all modes of transportation: 
Pages from Pool Table - MaineDOT Brunswick 9-12-19 meeting Finalrev1

Pool Table Study

Preliminary evaluation of transportation improvement alternatives on or adjacent to the Maine Street bridge over Route 1::